YEAR 1989 - 1997
SAN HUP SENG ENGINEERING CONTRACTOR CARRY OUT SHIP BUILDING & HEAVY STEEL REPAIRS
AND CONSTRUCTION OF HEAVY DUTY BARGES & PANTOONS , HEAVY DUTY COLUMNS ETC…
WITH RECONGNITION OF PAST YEAR TRACK RECORDS, KEPPEL SINGMARINE INVITE ‘SAN HUP SENG’ GIVEN A MAJOR CONTRACT TO BUILD COMPLETE 06 UNITS OFANCHOR HANDLING TUG & SUPPLY VESSELS (AHTS). FROM YR 1997 –YR 2000 AND DELIVER ON SCHEDULE .
YEAR 2000 - 2002
WITH GOOD WORK PERFORMANCE KEPPEL SINGMARINE GIVEN TO ‘SAN HUP SENG’ ANOTHER MAJOR CONTRACT TO BUILD COMPLETE 05 UNITS OF CABLE LAYING VESSELS FOR TYCOM COMPLETE WITH CABLE TANKS. FROM YR 2000 – YR 2002 AND DELIVER ON SCHEDULE .
SOME OF THE MAJOR COMPLETED PROJECTS IN KEPPEL SINGMARINE:
YEAR 2011 :
FIFI PUMP CAISSONS FABRICATION& INSTALLATION AT KEPPEL SHIPYARD FOR ‘FPSO PETROBRAS P58’ TOTAL: 90 M TONS
TURRET MOON POOL & VESSEL INTEGRATION STRUCTURE COMEPLETE FABRICATION & INSTALLATION DONE AT KEPPEL SHIPYARD FOR ‘FPSO ASENG’ TOTAL: 1050 M TONS
TURRET BOGIE SUPPORT STRUCTURE COMEPLETE FABRICATION & INSTALLATION DONE AT KEPPEL SHIPYARD FOR ‘FPSO ASENG’ TOTAL: 350 M TONS
TURRET GANTRY COMEPLETE STRUCTURE FABRICATION AND INSTALLATION DONE AT KEPPEL SHIPYARD FOR ‘FPSO ASENG’ TOTAL: 550M TONS
SPREAD MOOKING STRUCTURES FABRICATION & INSTALLATION DONE AT KEPPEL SHIPYARD FOR ‘FPSO CIDADE DE PARATY’ TOTAL: 1200M TONS
HEAVY DUTY DECK CRANE COLUMN COMEPLETE STRUCTURE FABRICATION AND INSTALLATION DONE AT KEPPEL SHIPYARD FOR ‘FPSO BERANTAI’ FOR PETROFAC TOTAL: 90M TONS
YEAR 2012 (UNDER CONSTRUCTION) :
TURRET MOON POOL ,
TURRET BOGIE SUPPORT STRUCTURE &
TURRET GANTRY STRUCTURE FABRICATION AND INSTALLATION AT KEPPEL SHIPYARD FOR ‘FPSO OSX 2’ TOTAL: 2300 M TONS
MOON POOL STRUCTURE & BOGIE SUPPORT STRUCTURE