YEAR 1989 – 1997 SAN HUP SENG ENGINEERING CONTRACTOR CARRY OUT SHIP BUILDING & HEAVY STEEL REPAIRS AND CONSTRUCTION OF HEAVY DUTY BARGES & PANTOONS , HEAVY DUTY COLUMNS ETC… VIEW PHOTOS HERE
YEAR 2000 – 2002 WITH GOOD WORK PERFORMANCE KEPPEL SINGMARINE GIVEN TO ‘SAN HUP SENG’ ANOTHER MAJOR CONTRACT TO BUILD COMPLETE 05 UNITS OF CABLE LAYING VESSELS FOR TYCOM COMPLETE WITH CABLE TANKS. FROM YR 2000 – YR 2002 AND DELIVER ON SCHEDULE.

YEAR 2002 – TILL TO DATE YEAR2012 (CONTINUE) WE CONTINUE RECEIVING MAJOR CONTRACTS FROM KEPPEL SINGMARINE TO BUILT:

- JACK UP RIGS (UPPER HULL & JACK CASES)
- JACK UP RIGS (LIVING QUARTERS ‘LQ’)
- ANCHOR HANDLING & SUPPLY VESSEL
- CONTAINER VESSELS
- CRANE BARGES
- ROCK DUMPING & FALL PIPE VESSEL.

YEAR 2002 STARTED KEPPEL SHIPYARD INVITE US AND AWARDED MAJOR CONVERSION ‘FPSO’ CONTRACTS WITH:

- FPSO EAGLE
- FPSO MARLIM SUL
- FSO PATTANI SPIRIT
- FPSO CAPIXABA
- FPSO ALVHEIM
- FSO BERGE HELENE
- FPSO PETROBRAS P-53
- FPSO CIDADE DE MAREUTUS
- FPSO VINCENT
- FPSO NINGALOO VISION
- FPSO P-57
- FPSO P-58
- FPSO ESPIRITO SANTO
- FPSO PERIGRINO
- BW PIONEER
- FPSO CAPIXABA (RELOCATION)
- FPSO ASENG
- FPSO CIDADE DE ANCHIETA
- FPSO EAST FORTUNE
- FPSO CIDADE DE PARATY
- FPSO OSX 2 (UNDER CONSTRUCTION)
VIEW PHOTOS HERE
YEAR 2011 FIFI PUMP CAISSONS FABRICATION& INSTALLATION AT KEPPEL SHIPYARD FOR ‘FPSO PETROBRAS P58’       TOTAL: 90 M TONS

TURRET MOON POOL & VESSEL INTEGRATION STRUCTURE COMEPLETE FABRICATION & INSTALLATION DONE AT KEPPEL SHIPYARD FOR ‘FPSO ASENG’       TOTAL: 1050 M TONS

TURRET BOGIE SUPPORT STRUCTURE COMEPLETE FABRICATION & INSTALLATION DONE AT KEPPEL SHIPYARD FOR ‘FPSO ASENG’       TOTAL: 350 M TONS

TURRET GANTRY COMEPLETE STRUCTURE FABRICATION AND INSTALLATION DONE AT KEPPEL SHIPYARD FOR ‘FPSO ASENG’       TOTAL: 550M TONS

COMPLETE FABRICATION & INSTALLATION OF ‘SPREAD MOORING STRUCTURES’ TO THE VESSEL AT KEPPEL SHIPYARD FOR ‘FPSO CIDADE DE PARATY’       TOTAL: 1200 M TONS

HEAVY DUTY DECK CRANE COLUMN COMEPLETE STRUCTURE FABRICATION AND INSTALLATION DONE AT KEPPEL SHIPYARD FOR ‘FPSO BERANTAI’ FOR PETROFAC       TOTAL: 90M TONS
VIEW PHOTOS HERE
YEAR 2012
(UNDER CONSTRUCTION)
TURRET MOON POOL ,
TURRET BOGIE SUPPORT STRUCTURE &
TURRET GANTRY STRUCTURE FABRICATION AND INSTALLATION AT KEPPEL SHIPYARD FOR
‘FPSO OSX 2’       TOTAL: 2300 M TONS
MOON POOL STRUCTURE & BOGIE SUPPORT STRUCTURE
VIEW PHOTOS HERE